Abstract. PT. DEF is a company that will plan gold mining in Simpenan District, Sukabumi Regency, West Java Province which needs to be done investment analysis and economic feasibility of mine to see gold reserve prospect in that location. Reference to the preparation of economic model used based on investment cost, production cost, and income from bullion gold sales. To consider this, an economics analysis is required based on the concept of discounted cash flow analysis and sensitivity analysis. The parameters used to determine economic viability in bullion gold production of PT. DEF are Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PBP) and sensitivity to NPV value due to changes in selling price and production cost. Discounted Cash Flow Analysis Rate of Return (DCFROR) is an investmentrelated analysis that takes into account the time value of money and discount rate calculated by the Weighted Average Cost of Capital method of 10,44%. Cash flow is calculated per year with the objective of evaluation determined through Cash Outlow reduction from Cash Inflow resulting from investment activity. Based on analysis result of DCFROR analysis, Net Present Value value is Rp Rp73.474.877.956, Internal Rate of Return is 89.56 %, with Payback Period is 1 year 2.64 months, then this project is feasible to run. The parameters of investment that become the sensitivity are production cost and selling price. Assessment of sensitivity to NPV value due to changes in selling price and production cost at PT. DEF assuming escalation of revenues and cost escalation by 2% until 50% and so that the value of Net Present Value generated can show how sensitive the value obtained from the parameters of selling price. When the selling price drops above 16% and the production cost rises above 48%, then the project will be a loss. Abstrak. PT DEF merupakan perusahaan yang melakukan penambangan emas di Kecamatan Simpenan, Kabupaten Sukabumi, Provinsi Jawa Barat, yang perlu dilakukan analisis investasi dan kelayakan ekonomi tambang untuk melihat prospek cadangan emas. Acuan penyusunan model ekonomi yang digunakan berdasarkan biaya investasi, biaya produksi, dan pendapatan dari penjualan bullion emas. Untuk mempertimbangkan hal tersebut maka diperlukannya analisis keekonomian berdasarkan konsep aliran kas diskonto (discounted cash flow analysis) dan analisis sensitivitas. Parameter yang digunakan untuk menentukan kelayakan ekonomi dalam produksi emas PT. DEF adalah Net Present Value (NPV), Internal Rate of Return (IRR), Payback Periode (PBP) dan sensitivitas terhadap nilai NPV akibat perubahan harga jual dan biaya produksi. Analisis Discounted Cash Flow Rate of Return (DCFROR) merupakan analisis yang berhubungan dengan investasi yang memperhitungkan nilai waktu dari uang dan discount rate yang dihitung dengan metode Weighted Average Cost of Capital yaitu 10,44%. Aliran kas dihitung pertahun dengan tujuan evaluasi yang ditentukan melalui pengurangan Cash Outlow dari Cash Inflow yang dihasilkan dari kegiatan investasi. Berdasarkan hasil pengkajian analisis DCFROR didapat nilai Net Present Value yaitu Rp73.474.877.956, Internal Rate of Return yaitu 89,56 %, dengan Payback Periode yaitu 1 tahun 2,64 bulan, maka proyek ini layak untuk dijalankan. Parameter investasi yang menjadi sensitivitas yaitu biaya produksi dan harga jual. Penilaian sensitivitas terhadap nilai NPV akibat perubahan harga jual dan biaya produksi di PT. DEF dengan asumsi eskalasi pendapatan sebesar 2% hingga 18% serta eskalasi biaya sebesar 2% hingga 50% sehingga nilai Net Present Value yang dihasilkan dapat menunjukan seberapa sensitif nilai yang didapatkan dari parameter harga jual. Ketika harga jual menurun diatas 16% dan biaya produksi naik diatas 48%, maka proyek ini akan rugi.
Abstract. PT X is a company engaged in the cement factory industry in West Java that uses an open-pit mining system with limestone mining. X is planning the location of waste dump placement using the in-pit dump method, so a safe and efficient final slope design is needed. For optimal stockpiling activities, slope geometry planning on the waste material dump needs to be carried out slope stability analysis. Slope stability is influenced by slope height, slope angle, rock mass strength, rock type, and groundwater level. The purpose of this research is to find out whether or not a slope is stably displayed in the Safety Factor (FK) value. Analysis process is carried out using the Finite Element Method and the Boundary Equilibrium Method. The analysis was carried out on bedrock and pile material. Analysis of bedrock using Finite Element Method in the Goa area in Sections A - B and C - D obtained SRF values of 4.6 and 16 with a total displacement of 13,771 m and 6 m. In the area of Mount Bindis Section E - F and G - H obtained SRF values of 2.5 and 4.75 with a total displacement of 11.8 m and 3 m. Analysis of the embankment material in the Goa In areas with Sections A - B and C - D FK values obtained = 2.11 and 1.56 and for Section C - D FK 2.62 and 1.94. In the Mount Bindis Area with sections E - F and G - H FK values = 1.59 and for Section G - H FK values = 2.31 and 1.57. The disposal obtained the amount of volume that will be accommodated in each area of 11,175,191.19 LCM and 74,749,919.45 LCM. Abstrak. PT X adalah perusahaan yang bergerak di industri pabrik semen di Jawa Barat yang menggunakan sistem penambangan terbuka dengan penambangan batu kapur. X sedang merencanakan lokasi penempatan pembuangan limbah dengan menggunakan metode pembuangan di dalam pit, sehingga diperlukan desain lereng akhir yang aman dan efisien. Untuk kegiatan penimbunan yang optimal, perencanaan geometri lereng pada tempat pembuangan bahan limbah perlu dilakukan analisis stabilitas lereng. Stabilitas lereng dipengaruhi oleh ketinggian lereng, sudut lereng, kekuatan massa batuan, jenis batuan, dan tingkat air tanah. Tujuan dari penelitian ini adalah untuk mengetahui apakah kemiringan secara stabil ditampilkan dalam nilai Safety Factor (FK). Proses analisis dilakukan dengan menggunakan Metode Elemen Hingga dan Metode Kesetaraan Batas. Analisis dilakukan pada material batuan dasar dan tiang pancang. Analisis batuan dasar menggunakan Metode Elemen Hingga di daerah Goa di Bagian A - B dan C - D memperoleh nilai SRF 4,6 dan 16 dengan total perpindahan 13,771 m dan 6 m. Di daerah Gunung Bindis Bagian E - F dan G - H diperoleh nilai SRF 2,5 dan 4,75 dengan total perpindahan 11,8 m dan 3 m. Analisis bahan timbunan di Goa Di daerah dengan Bagian A - B dan C - D nilai FK diperoleh = 2.11 dan 1.56 dan untuk Bagian C - D FK 2.62 dan 1.94. Di Wilayah Gunung Bindis dengan bagian E - F dan G - H nilai FK = 1,59 dan untuk Bagian G - H nilai FK = 2,31 dan 1,57. Pembuangan memperoleh jumlah volume yang akan ditampung di masing-masing area 11.175.191 LCM dan 74.749.919,45 LCM.
Abstract. PT Lotus SG Lestari is a private mining company engaged in the mining of Andesite Quarry located in Cipinang Village, Rumpin District, Bogor Regency, West Java Province. With a total area of ± 105 Ha. One part of the mining industry is reclamation activities, where reclamation itself is a very mandatory thing to do, because ex-mining land activities can change the landscape and land use of an area. Reclamation is an activity that aims to improve or organize land that has been disturbed due to mining activities so that it can function and be useful according to its necessarily. The purpose of this research is to know the technical plan for land management, revegetation and care and maintenance in an area ex-andesite mining activities where reclamation activities will be carried out. Another objective of this activity is to find out the total cost required for the planned reclamation activity in terms of its economics. The plan for the technical scheme of reclamation to be reclaimed is implemented out from 2022-2026 with the reclamation area in accordance with the area being mined. The total area to be reclaimed is 5.0 Ha, at first stage of land management, there is mechanical equipment will be used such as Kobelco SK330 Excavator, FM260 JD - Hino 500 Dumptruck, and Komatsu D85PX-18 Bulldozer. At second stage revegetation (replantation) plants used are main plants in the form of Jabon plants (Neolamarckia cadamba), insert plants in the form of Banana trees (Musa acuminata) and cover crops in the form of Peanut (Mucuna bracteata). This reclamation technical plan will be continued until the last stage there is treatment and maintenance of revegetation plants so that plant growth can be optimal and the success of reclamation is 100%. Based on the result of this researches, it can be concluded that the Mining Business Permit (MBP) for the production operation activities of PT Lotus SG Lestari will expire in 2025 and will enter the last year of reclamation implementation. The total budget and cost for this reclamation plan is Rp 970.162.094,-. Abstrak. PT Lotus SG Lestari merupakan perusahaan tambang swasta yang bergerak pada bidang pertambangan Quarry Andesit yang berlokasi di Kampung Pabuaran, Desa Cipinang, Kecamatan Rumpin, Kabupaten Bogor, Provinsi Jawa Barat. Dengan luas wilayah keseluruhan ± 105 Ha. Salah satu bagian dari industri pertambangan adalah kegiatan reklamasi, di mana reklamasi sendiri adalah hal yang bersifat sangat wajib dilakukan, karena lahan bekas kegiatan penambangan dapat merubah bentang alam maupun tataguna lahan suatu wilayah. Reklamasi merupakan kegiatan yang bertujuan untuk memperbaiki atau menata lahan yang sudah terganggu akibat adanya kegiatan penambangan agar dapat berfungsi dan berguna sesuai peruntukannya. Tujuan dari penelitian ini yaitu mengetahui rencana teknis penataan lahan, revegetasi serta perawatan dan pemeliharaan pada suatu area bekas kegiatan penambangan batu andesit yang akan dilakukan kegiatan reklamasi. Tujuan lain dari kegiatan ini, yaitu untuk mengetahui total biaya yang dibutuhkan untuk rencana kegiatan reklamasi ditinjau dari sisi keekonomisannya. Rencana skema teknis penataan lahan yang akan direklamasi dilakukan dari tahun 2022-2026 dengan luas area reklamasi sesuai dengan luas area yang dilakukan penambangan. Luas total yang akan direklamasi 5,0 Ha. Pada tahapan penatagunaan lahan akan digunakan peralatan mekanis berupa Excavator Kobelco SK330, Dump Truck Hino 500 - FM260JD, dan Bulldozer Komatsu D85PX-18. Pada tahapan revegetasi tanaman yang digunakan antara lain, yaitu tanaman pokok berupa tanaman Jabon (Neolamarckia cadamba), tanaman sisipan berupa pohon Pisang (Musa acuminata) dan tanaman penutup berupa tanaman Kacang-kacangan (Mucuna bracteata). Rencana teknis reklamasi ini akan dilanjutkan hingga tahapan perawatan dan pemeliharaan tanaman revegetasi agar pertumbuhan tanaman dapat optimal dan tercapainya keberhasilan reklamasi sebesar 100%. Berdasarkan hasil penelitian dapat disimpulkan bahwa Izin Usaha Pertambangan (IUP) untuk kegiatan operasi-produksi PT Lotus SG Lestari akan berakhir pada tahun 2025 dan akan memasuki tahun terakhir pelaksanaan reklamasi. Adapun anggaran total biaya rencana reklamasi ini dibutuhkan sebesar Rp 970.162.094,-.
Abstract. Coal mining at PT X Banko Barat site uses the Strip Mine type Open Mine System using mechanical equipment. To breaking coal from Pit 1 Timur using ripping with the Komatsu D 375 Bulldozer A. As for the digging and loading using Backhoe Komatsu PC 400 and Backhoe Hitachi ZX 470 Lc The problem with the company is the large size of the fragmentation of ripping coal which is greater than 20 cm which is not in accordance with the specifications of the grizzly dump hopper, so there must be a reduction in the size of the coal back by the backhoe so that production is getting lower. This study aims to optimize the ripping bulldozer space on coal so that it will produce coal fragmentation smaller than the actual ripping and the effect of coal fragmentation on bulldozer and backhoe production. The research included taking data of bulldozer cycle time ripping, backhoe cycle time, bulldozer obstacle time, backhoe obstacle time, coal density and coal fragmentation. From these data we will know the effect of bulldozer ripping spacing on the fragmentation of coal produced and the effect on bulldozer and backhoe production. For the East Pit coal production target, West Banko is 360,000 tons/ month. The actual bulldozer ripping space is 80 cm with B2 coal fragmentation yield of more than 20 cm is 11.36% with 363,476.74 tons/month ripping bulldozer and backhoe production 363,477.32 tons/month. For the 60 cm ripping spacing improvement, the B2 coal fragmentation yield of more than 20 cm is 3.05% with a bulldozer ripping production of 347,670.27 tons/month and backhoe production of 347,670.7 tons/month. As for the 40 cm ripping spacing improvement, B2 coal fragmentation which is more than 20 cm is 1.58% with a bulldozer ripping production of 288,922.03 tons / month and backhoe production of 288,922.9 tons/month. Based on the results of the study, coal fragmentation of more than 20 cm has reached the Company's SOP, which is less than 2%, but the production target has not been reached, so efforts must be made to improve. The improvement effort is by adding a bulldozer and increasing the bulldozer work efficiency. Bulldozer production was obtained at 385,229.37 tons/month and backhoe production at 385,229.60 tons/month so as to reach the production target. Abstrak. Penambangan batubara pada PT X Site Banko Barat menggunakan Sistem Tambang Terbuka tipe Strip Mine dengan menggunakan peralatan mekanis. Untuk memberaikan batubara pada Pit 1 Timur menggunakan ripping dengan Bulldozer Komatsu D 375 A. Sedangkan untuk penggalian dan pemuatannya menggunakan Backhoe Komatsu PC 400 dan Backhoe Hitachi ZX 470 Lc. Adapun masalah pada perusahaan adalah banyaknya ukuran fragmentasi batubara hasil ripping yang lebih besar dari 20 cm yang tidak sesuai dengan spesifikasi grizzly dump hopper, sehingga harus ada pengecilan ukuran batubara kembali oleh backhoe sehingga produksinya semakin rendah. Penelitian ini bertujuan untuk mengoptimalkan spasi ripping bulldozer pada batubara sehingga akan menghasilkan fragmentasi batubara yang lebih kecil dibandingkan dengan ripping aktualnya dan pengaruh fragmentasi batubara terhadap produksi bulldozer dan backhoe. Penelitian meliputi pengambilan data cycle time ripping bulldozer, cycle time backhoe, waktu hambatan bulldozer, waktu hambatan backhoe, densitas batubara dan fragmentasi batubara. Dari data tersebut akan diketahui pengaruh dari spasi ripping bulldozer terhadap fragmentasi batubara yang dihasilkan serta pengaruh terhadap produksi bulldozer dan backhoe. Untuk target produksi batubara Pit Timur, Banko Barat adalah 360.000 ton/bulan. Spasi ripping bulldozer aktual adalah sebesar 80 cm dengan hasil fragmentasi batubara B2 yang lebih dari 20 cm adalah 11,36% dengan produksi ripping bulldozer sebesar 363.476,74 ton/bulan dan produksi backhoe sebesar 363.477,32 ton/bulan. Untuk spasi ripping perbaikan 60 cm dengan hasil fragmentasi batubara B2 yang lebih dari 20 cm adalah 3,05% dengan produksi ripping bulldozer sebesar 347.670,27 ton/bulan dan produksi backhoe sebesar 347.670,7 ton/bulan. Sedangkan untuk spasi ripping perbaikan 40 cm dihasilkan fragmentasi batubara B2 yang lebih dari 20 cm adalah 1,58% dengan produksi ripping bulldozer sebesar 288.922,03 ton/bulan dan produksi backhoe sebesar 288.922,9 ton/bulan. Berdasarkan hasil penelitian, fragmentasi batubara yang lebih dari 20 cm telah mencapai SOP Perusahaan yaitu kurang dari 2%, tetapi target produksinya tidak tercapai, sehingga harus ada upaya perbaikan. Adapun upaya perbaikannya adalah dengan menambahkan satu alat bulldozer dan meningkatkan efisiensi kerja bulldozer. Didapatkan produksi bulldozer sebesar 385.229,37 ton/bulan dan produksi backhoe sebesar 385.229,60 ton/bulan sehingga telah mencapai target produksi.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.