We consider an assembly line with m stations in series having finite capacity buffers. Blocking occurs when buffers are full. There are M different types of products to be assembled, each with its own processing requirements. There is a production target set for each type. The problem is to operate the line to maximize throughput. We propose heuristic approaches to this problem based on an equivalent maximum flow problem and on critical path techniques.
Consider a network C = ( V , E ) with distinguished vertices s and t , and with k different costs on every edge. We consider the problem of finding k disjoint paths from s to t such that the total cost of the paths is minimized, where thejth edge-cost is associated with thejth path. The problem has several variants: The paths may be vertex-disjoint or arcdisjoint and the network may be directed or undirected. We show that all four versions of the problem are strongly NP-complete even for k = 2. We describe polynomial time heuristics for the problem and a polynomial time algorithm for the acyclic directed case.Q 1992 John Wiley & Sons, Inc.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.