Abstract-The preseries production of the LHC main superconducting dipoles is presently being tested at CERN. The foremost features of these magnets are: twin structure, six block two layer coils wound from 15.1 mm wide graded NbTi cables, 56 mm aperture, polyimide insulation and stainless steel collars. This paper reviews the main test results of magnets tested to day in both normal and superfluid helium. The results of the training performance, magnet protection, electrical integrity and the field quality are presented in terms of the specifications and expected performance of these magnets in the future accelerator.Index Terms-Magnetic field measurement, superconducting accelerator magnets.
A simplified scheme for the provision of antiprotons at 100 MeV/c based on fast extraction is described. The scheme uses the existing p production target area and the modified Antiproton Collector Ring in their current location. The physics programme is largely based on capturing and storing antiprotons in Penning traps for the production and spectroscopy of antihydrogen. The machine modifications necessary to deliver batches of 1 u 10 7 p /min at 100 MeV/c are described. Details of the machine layout and the experimental area in the existing AAC Hall are given.
A simplified scheme for the provision of antiprotons at 100 MeV/c based on fast extraction is described. The scheme uses the existing p production target area and the modified Antiproton Collector Ring in their current location. The physics programme is largely based on capturing and storing antiprotons in Penning traps for the production and spectroscopy of antihydrogen. The machine modifications necessary to deliver batches of 1 u 10 7 p /min at 100 MeV/c are described. Details of the machine layout and the experimental area in the existing AAC Hall are given.
For the Large Hadron Collider under construction at CERN and the testing of its 1706 Cryo-magnets in cryogenic conditions, considerable challenges had to be overcome since 2002 to arrive at the situation of today, with semi-routine operation of the purpose built tests facility. With the setting up of an Operation Team comprising of few non-expert CERN Accelerator operation staff, and a large external collaboration, it was essential to develop the methodology of working in light of external collaboration limits and base it on CERN-known techniques and experience in accelerator running-in, commissioning and routine operation. A flavour of the operation tools that were necessary or developed will be given, i.e., web-based tests follow-up management & information systems, development of precisely defined 'to do list' of tests sequences, associated methods, procedures and strict check-lists, electronic logbooks and so forth. The presentation will briefly outline the tests operation programme and its context & constraints, give a summary of the accomplishments so far, together with the outlook for the successful completion of the whole programme within the project goals. TESTING OF THE LHC MAGNETS IN CRYOGENIC CONDITIONS: OPERATION CHALLENGES, STATUS AND OUTLOOKV. Chohan¹, CERN, Geneva, Switzerland ABSTRACTFor the Large Hadron Collider under construction at CERN and the testing of its 1706 Cryo-magnets in cryogenic conditions, considerable challenges had to be overcome since 2002 to arrive at the situation of today, with semi-routine operation of the purpose built tests facility. With the setting up of an Operation Team comprising of few non-expert CERN Accelerator operation staff, and a large external collaboration, it was essential to develop the methodology of working in light of external collaboration limits and base it on CERNknown techniques and experience in accelerator runningin, commissioning and routine operation. A flavour of the operation tools that were necessary or developed will be given, i.e., web-based tests follow-up management & information systems, development of precisely defined 'to do list' of tests sequences, associated methods, procedures and strict check-lists, electronic logbooks and so forth. The presentation will briefly outline the tests operation programme and its context & constraints, give a summary of the accomplishments so far, together with the outlook for the successful completion of the whole programme within the project goals.
This paper reviews the recent performance of the AAC and LEAR. Activities on the AAC include the successful exploitation of a magnetic horn as an antiproton collector lens and an energy-saving mode of operation, which has been possible since 1992, when LEAR became the only client of the AAC. LEAR worked in its full momentum range between 100 MeV/c and 2 GeV/c, with performance (intensities, ejection modes and spill length) exceeding the design specifications. Improvements are described, which contributed to the quality of the beam delivered to experiments. The reliability and availability of the antiproton machines are also discussed.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.