Purpose is to develop efficient scheduling to excavate steep-grade iron-ore deposits using near-vertical layers relying upon production practices by an open pit of Poltava Mining-and-Processing Integrated Works (MPIW). Methods. The goal achievement involved system analysis of openwork scheduling for steep-grade iron-ore deposits by means of near-vertical layers in an open pit of Poltava MPIW; the scheduling process was structured from the viewpoint of decision-making under uncertainty. Findings. New scheduling methods to excavate steep-grade iron-ore deposits by means of near-vertical layers have been developed. The methods have been represented in the informal (descriptive) structure being mandatory for further transition to formalization of certain stages of technological decision-making during scheduling. To improve the scheduling efficiency, it is recommended to prepare initial process data using K-MINE software; Deswik software is recommended to determine economic indices as well as pit outlines. Originality.For the first time ever, a new mechanism of expedient spatiotemporal control of the specific excavation volumes while varying both “starting” time and intensity of a layer mining has been identified for the traditional openwork. The mechanism makes it possible to implement piecewise stable dynamics of annual output. Moreover, it also helps solve inverse problem, i.e. determine target values of spatiotemporal controlled parameters (i.e. “starting” time and intensity of the layer mining) for the required dynamics of ore and overburden excavation amounts. Practical implications. The proposed methods concerning scheduling steep-grade iron-ore deposit mining using near-vertical layers relying upon production practices by an open pit of Poltava MPIW have been tested successfully. Their efficiency has been proved. Currently, they are the key procedures being applied to schedule extraction using near-vertical layers in the context of the considered open pit. Keywords: iron-ore deposits, openwork, steep-grade layers, scheduling
The purpose of this article is to develop a new methodology for assessing the stability margin of iron ore opencast sides sections. The sequence of work. To achieve this goal, at the first stage, high-resolution photography was carried out for characteristic sections of the pit wall, followed by computer processing of photographs to assess the fracturing of rocks. The next step was the calculation of the fractal dimension of the array section from the obtained images using the ImageJ and FracLac programs, including the MicroMod2015 plug-in package (add-ons). The next step was assess the disturbance of the massif due to fracturing, a study of the relationship between the fractal dimension and the coefficient of structural weakening was carried out (this coefficient is determined by the classical method through the ratio of the strength of rocks in the massif and in the sample). At the last stage of the work, after establishing the specified connection and calculating the coefficient of structural weakening of rocks that based on the results of determining the fractal dimension, an assessment of the stability margin iron ore opencast sides sections that carried out. The known dependence of the stability safety factor on the coefficient of structural weakening of the array was used. As a result of comparing the fractal dimension of the exposed massif areas based on photographs with the calculation by classical methods, the discrepancy in the structural attenuation coefficient was 5-10%. This indicates a satisfactory convergence and allows the use of this express technique for assessing the fracturing of a section of a pit flank on the basis of fractal dimension. The scientific novelty of the results obtained - for the first time, the analytical dependence of the structural weakening coefficient of rocks on the fractal dimension of the massif cracks was established, which made it possible to simplify the procedure for its calculation. The practical significanceof the work lies in the creation of a new methodology for assessing the stability margin of an iron ore opencast side sections that the basis of rock fractures fractal analysis.
Мета роботи-підвищення ефективності та надійності методичного забезпечення місячнодобового планування гірничо-транспортних робіт в залізорудному кар'єрі. Методика виконання. Аналіз та структуризація множини можливих послідовностей відпрацювання місячних планових блоків. Обгрунтування критеріальних оцінок структурованих підгруп послідовностей відпрацювання місячних планових блоків. Застосування методу гілок і границь для аналізу, відсіву недоцільних варіантів послідовностей та формування множини їх раціональних варіантів. Рішення типової задачі місячно-добового планування гірничо-транспортних робіт залізорудного кар'єру. Порівняльний аналіз ефективності і надійності двох підходів: вирішення тільки типової задачі місячно-добового планування та формування області раціональних послідовностей і рішення типової задачі на сформованій області. Результати. Запропоновано правила аналізу та структуризації множини можливих послідовностей відпрацювання місячних планових блоків. Обгрунтувані критеріальні оцінки раціональності варіантів можливих послідовностей. На основі методу гілок і границь створена методика визначення раціональних послідовностей відпрацювання планових місячних блоків протягом місяця, на множині яких повинна вирішуватись типова задача місячно-добового планування гірничо-транспортних робіт. Наукова новизна. Отримав подальший розвиток динамічний підхід до вирішення задач оперативного планування гірничо-транспортних робіт в залізорудному кар'єрі, що був реалізований методикою визначення раціональних послідовностей відпрацювання планових місячних блоків протягом місяця. Практична значимість полягає у загальній методиці місячно-добового планування гірничо-транспортних робіт залізорудного, що включає створену методику визначення раціональних послідовностей відпрацювання планових місячних блоків протягом місяця та методику рішення типової задачі місячно-добового планування. Порівняльний аналіз результатів місячно-добового планування по реальним виробничим даним за 33 місячними програмами гірничих робіт без застосування створеної методики і з нею показав зменшення коливань об'ємних та якісних показників в добових об'ємах доставки руди на перевантажувальні пункти. До того
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.