Deal with brown oil field with runlife of the production more than 35 years has many challenges. Pressure depletion was one of the main concerns of maintaining survival of the field. From the geological aspect, reservoir which produced from limestone was also have many challenges, especially for heterogeneity of the reservoir. Both problems were faced in Rama field which impact the low recovery factor of this brown limestone field. Some approaches was held to increase oil recovery of this field, integrated sub surface review was done aggressively to bring some concept and followed up by some efforts from drilling, workover also surface facility.Rama field was developed in 1975 with the initial production was about 20,000 BOPD. As of June 2009, Rama field has been producing more than 137 MMBO with production Ϯ 4,000 BOPD mainly from Upper Baturaja. A waterflood project was held in the field from 1982 until 1991 where a large amount of sea water had been injected into Baturaja formation. As the result, the reservoir pressure increased and maintained from 700 psi into 950 psi during the water flood period. However, early water breakthrough was occurred as well and got the water cut jumped into more than 90% from initially 60%. In some wells the water cut could be as high as 99%. Due to its bad impact on the oil production the water flood project was suspended in 1991. Ten years later an oil re-saturation phenomenon has been observed from some wells produce from Upper Baturaja with water cut in the range of 50 -90%. The oil production rate from Upper Baturaja was 3,000 BOPD with 85% -90% water cut. In early 2009 two infill well was drilled and one well was reactivated and gave good indication of decreasing water cut Rama E wells are among the wells that got bad impact from massive waterflood due to water cut increase, and one by one those wells are abandoned. The platform itself has been abandoned since 1999. Regarding good result of two infill and one reactivation wells, it was proposed to reactivate Rama E platform by modification of Rama-E platform include refurbishment of existing platform, installation of mezzanine deck, Power Control Room, iso-transformer, production process piping and equipment. Reactivation of the wells themselves would be done using jack up rig and snubbing unit.The objective of this project is to add oil reserves and production with sufficient cost by doing reactivation abandoned platform without drilling new wells.The recovery factor by June 2009 from Upper Baturaja is estimated 14% (OOIP Ϸ 505 MMBO). By reactivation of five wells in Rama E, reserve increase up to 631 MBO (2011), it was increase recovery factor significantly.
Inert Gas System adalah pesawat bantu yang digunakan untuk mempertahankan kadaroksigen yang rendah dalam tangki sehingga memungkinkan timbulnya kebakaran. Purging padatangki-tangki muatan yang kosong dengan maksud menggantikan campuran hidrokarbon gasdengan inert gas agar bisa mengurangi konsentrasi atau kadar hidrokarbon di bawah garisyang disebut Critical Dilution. Kalau sampai ada udara segar masuk ke dalam tangki tersebutmaka kondisi atmosfir dalam tangki akan segera masuk dalam kantong dimana campuran inidapat terbakar atau rusak. Terdapat 3 permasalahan yang terdapat pada IGS saat dioperasikanyaitu perawatan Deck Water Seal diperlukan dalam pengoperasian IGS, dampak apabila DeckWater Seal tidak bekerja secara maksimal dan upaya yang dilakukan agar Deck Water Sealbekerja secara maksimal dalam pengoperasian IGS.
Untuk mengupayakan agar IGS dapat beroperasi dengan maksimal maka diadakanpenanganan yang baik dan tepat, dalam mencari solusi permasalahan digunakan metode FaultTree Analysis (FTA). Metode analisis ini terutama digunakan dalam bidang teknik keselamatandan rekayasa keandalan untuk memahami bagaimana sistem bisa gagal, untuk mengidentifikasicara terbaik untuk mengurangi resiko angka kejadian kecelakaan keselamatan atau systemfungsional, FTA mengidentifikasi hubungan antara faktor penyebab dan ditampilkan dalambentuk pohon kesalahan yang melibatkan suatu gerbang logika sederhana. Perawatan DeckWater Seal sangat penting dalam pengoperasian IGS, yaitu salah satunya merawat komponenyang menunjang kinerja dari Deck Water Seal seperti demister pad, inert gas blower. Dalamdemister pad ada komponen lain yaitu deck seal pump dan drain valve. Begitu juga dalan inergas blower ada safety valve, mast riser, non return valve. Komponen tersebut sangatlah pentingguna menunjang kinerja dari deck water seal. Masinis dapat melaksanakan kegiatan perawatandengan baik terhadap deck water seal, agar kerja dari deck water seal dapat bekerja secaramaksimal pada saat pengoperasian IGS di kapal.
This article discusses English vocabulary learning medium for young learners through songs and stories inspired by the implementation of a community service program at the Pondok Kasih Orphanage, Salatiga. It aims to attract interest and motivate children to learn English. Research and Development method is used for the development of 4D (Define, Design, Develop, and Dissemination) by observation and documentation as the data collection techniques. The existing data are analyzed descriptive qualitatively. English Vocabulary media developed in this program is in the form of an audiobook which contains Indonesian children's songs that are translated into English and created in the form of stories. This medium is needed to attract and motivate children in learning English vocabulary in orphanages and young children learning communities.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.