This version includes a task reassigning algorithm to banlance workload imbalances between/amongst cores on a physical machine in the local cloud/cluster or a rented virtual machine from the public cloud and the performance evaluation for the task reassignment.
Outsourcing jobs to a public cloud is a cost-effective way to address the problem of satisfying the peak resource demand when the local cloud has insufficient resources. In this paper, we study on managing deadline-constrained bag-of-tasks jobs on hybrid clouds. We present a binary nonlinear programming (BNP) problem to model the hybrid cloud management where the utilization of physical machines (PMs) in the local cloud/cluster is maximized when the local resources are enough to satisfy the deadline constraints of jobs, while when not, the rent cost from the public cloud is minimized. To solve this BNP problem in polynomial time, we proposed a heuristic algorithm. Its main idea is assigning the task closest to its deadline to current core until the core cannot finish any task within its deadline. When there is no available core, the algorithm adds an available PM with most capacity or rents a new VM with highest cost-performance ratio. Extensive experimental results show that our heuristic algorithm saves 16.2%-76% rent cost and improves 47.3%-182.8% resource utilizations satisfying deadline constraints, compared with first fit decreasing algorithm.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.