1996
DOI: 10.2172/578524
|View full text |Cite
|
Sign up to set email alerts
|

Innovative subsurface stabilization project -- Final Report

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

1996
1996
1998
1998

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(7 citation statements)
references
References 1 publication
0
7
0
Order By: Relevance
“…The "soil pit" in the region to be grouted was undisturbed soil except for boreholes to introduce tracer material (molybdenum powder as a stand-in for mercuric oxide). Tracer material was introduced in boreholes corresponding to holes 3,9,11,17,19,27, 25 in a nominally 6-ft zone as shown on Table 1 ( Figure 14 shows the hole numbers). A total of 50.86 kg of pure molybdenum powder was added in equal amounts in 7 holes.…”
Section: M93 Rm03mentioning
confidence: 99%
See 2 more Smart Citations
“…The "soil pit" in the region to be grouted was undisturbed soil except for boreholes to introduce tracer material (molybdenum powder as a stand-in for mercuric oxide). Tracer material was introduced in boreholes corresponding to holes 3,9,11,17,19,27, 25 in a nominally 6-ft zone as shown on Table 1 ( Figure 14 shows the hole numbers). A total of 50.86 kg of pure molybdenum powder was added in equal amounts in 7 holes.…”
Section: M93 Rm03mentioning
confidence: 99%
“…However, because returns were excessive and original objectives for depth could not be achieved due to a particularly hard clay layer below 15 ft (even 8,13,15,11,9,5,7,14,16,12,10 Tracarlnholm 6,13,15 SamplingInhokm 6,8,13,15,9,7,16,10 Figure 21. Grouting with the CASA GRANDE C8 drilling system ii I 2,15,18, 19,22,23,14, Tracer in holes 3,9,11,17,27 Sampling in holes 1,18,19,22 Soil pit (Phase-2 testing) (Graphic M98 0005).…”
Section: Phase-2 Testingmentioning
confidence: 99%
See 1 more Smart Citation
“…Approximately 70 gal of grout was injected at each grouting center. A more detailed description of the grouting methods can be found in Innovarive Subsu@ace Stabilization Roject-Final Report (Loomis 1996).…”
Section: Jet Groutingmentioning
confidence: 99%
“…Some cored intervals showed grout penetration; others were relatively untouched by the grout. More information on the drilling and grouting can be found in Innovative Subsqface Stabilization Project-Final Report (Loomis 1996).…”
Section: Core Drillingmentioning
confidence: 99%