Monte Carlo simulation for predicting the reliability of a boiler in the Nagan Raya steam power plant

Abstract: The Nagan Raya steam power plant 2x110 Megawatt is one of the power plants owned by PT. PLN (Persero) located in Aceh. The Nagan Raya steam power plant that operates continuously is often failure. An overhaul of maintenance activities that lasted only six months was the cause of frequent disruptions or failures. Performance evaluation in terms of reliability is urgently needed to minimize the failure. This study aims to determine the level of reliability and preventive maintenance time based on Monte Carlo sim… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 3 publications
0
2
0
Order By: Relevance
“…It was built by using Microsoft Excel [24]. The benefits of the Monte Carlo simulation are easy to implement and the results are close to true values [25].…”
Section: Introductionmentioning
confidence: 98%
“…It was built by using Microsoft Excel [24]. The benefits of the Monte Carlo simulation are easy to implement and the results are close to true values [25].…”
Section: Introductionmentioning
confidence: 98%
“…The Failure Mode and Effects Analysis (FMEA) approach will be incorporated to identify the potential damage, effects, and impacts on the ship. FMEA is widely used in various engineering fields, particularly in assessing the production systems of manufacturing activities (I Pamungkas & Dirhamsyah, 2019;Rastayesh et al, 2019;Yucesan et al, 2021). LTA has been widely used in various problems, such as minimizing the risk of natural disasters (Bommer & Scherbaum, 2008;Porter et al, 2017;Satake et al, 2007), machine maintenance problem management (Tang et al, 2015;Waghen & Ouali, 2019, and operational hazard risk (Abdelgawad & Fayek, 2012;Akyuz et al, 2020;Ramzali et al, 2015).…”
Section: Introductionmentioning
confidence: 99%