2013
DOI: 10.1590/s0104-530x2013000300004
|View full text |Cite
|
Sign up to set email alerts
|

Proposição de um modelo para análise dos fatores de risco em projetos de implantação da metodologia lean

Abstract: Managing risks associated with lean methodology implementation is important in order to overcome the low success rate for such projects. This paper presents three main contributions to this subject: (i) identification of risk factors of lean methodology implementation projects, (ii) degree of relationship between the factors identified, and (iii) algorithm for estimating the probability of a successful lean methodology project implementation, considering the type of factors and the degree of relationship betwe… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
5
0

Year Published

2015
2015
2019
2019

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(5 citation statements)
references
References 56 publications
0
5
0
Order By: Relevance
“…Risk analysis can be carried out using qualitative or quantitative tools or using mixed methods (Scherer & Ribeiro, 2013). This article aims to analyze the individual perception of workers and their implications associated with the use of auditory PPE, developing a statistical analysis of the variables identified, quantifying results, and analyzing the effects of the factors involved.…”
Section: Introductionmentioning
confidence: 99%
“…Risk analysis can be carried out using qualitative or quantitative tools or using mixed methods (Scherer & Ribeiro, 2013). This article aims to analyze the individual perception of workers and their implications associated with the use of auditory PPE, developing a statistical analysis of the variables identified, quantifying results, and analyzing the effects of the factors involved.…”
Section: Introductionmentioning
confidence: 99%
“…The low success rate and complex structural and organizational changes demanded by LPI indicate the need to use an appropriate approach, such as the risk management (RM) system (Scherer & Ribeiro, 2013). This perspective implies the use of a robust base of concepts and tools that contribute to both the identification of LPI difficulties and to their management according to the plan, do, check, action cycle .…”
Section: Introductionmentioning
confidence: 99%
“…This possibility stems from the maturity of the risk management theme in other types of projects, such as software development (Boehm, 1991;Aloini et al, 2012) and supply chain management (Ritchie & Brindley, 2007). The few studies using the risk management approach to LPI have been conducted by Scherer & Ribeiro (2013), and .…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…In sequence, it presents the report of an empirical experience that is a result of a doctoral thesis related to the implementation of performance improvement systems in organizations, trying to understand why so many initiatives do not achieve their initial goals. Indeed, there are reports in the literature (Bourne, Neely, Mills, & Platts, 2003;Neely & Bourne, 2000;Scherer & Ribeiro, 2013;Trad & Maximiano, 2009;Waal & Counet, 2009;Walter & Tubino, 2013) that show the high degree of failure of the implementations.…”
Section: Introductionmentioning
confidence: 99%