Spanning the multilevel boundaries of construction organisations

Abstract: Purpose The purpose of this paper is to study the interdependent boundary-spanning activities that characterise the level of permeability of knowledge, information flow and learning among construction supply chains involved in the delivery of building information modelling (BIM)-compliant construction projects. Construction projects are mobilised through a number of interdependent processes and multi-functional activities by different practitioners with myriad specialised skills. Many of the difficulties that … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
10
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 10 publications
(10 citation statements)
references
References 35 publications
0
10
0
Order By: Relevance
“…These include time and cost savings (Fan et al , 2013; Suermann and Issa, 2009), reduction of rework, and increased productivity (Love et al , 2011). BIM uptake is also expected to facilitate the ability of multidisciplinary and multifunctional teams to cope with difficult situations that emerge at various project stage boundaries, thereby improving efficiencies (Sackey and Akotia, 2017). Based on these benefits, governments in various countries have begun to openly adopt BIM to oversee the creation and management of information throughout the project lifecycle (Arayici et al , 2012; Herr and Fischer, 2019; Vidalakis et al , 2019; Yuan and Yang, 2019).…”
Section: Introductionmentioning
confidence: 99%
“…These include time and cost savings (Fan et al , 2013; Suermann and Issa, 2009), reduction of rework, and increased productivity (Love et al , 2011). BIM uptake is also expected to facilitate the ability of multidisciplinary and multifunctional teams to cope with difficult situations that emerge at various project stage boundaries, thereby improving efficiencies (Sackey and Akotia, 2017). Based on these benefits, governments in various countries have begun to openly adopt BIM to oversee the creation and management of information throughout the project lifecycle (Arayici et al , 2012; Herr and Fischer, 2019; Vidalakis et al , 2019; Yuan and Yang, 2019).…”
Section: Introductionmentioning
confidence: 99%
“…Better Collaboration and Communication (P2) BIM models allow paper drawing sets to be shared, collaborated on, and versioned to minimise waste during the planning and design stage. This consequence is the same as [77,78]. The BIM 360 platform enables teams to share project templates and plan ahead of time, ensuring that all design stakeholders are fully prepared.…”
Section: Ranking Of Factors For Pre-emptive Waste During the Planningmentioning
confidence: 97%
“…Virtual tools such as CAD and BIM systems are efficient boundary objects to promote knowledge sharing among designer, constructors and other project users (Fellows and Liu, 2012). BIM technological solutions benefit the boundary spanning engagement and successful BIM-compliance project delivery (Sackey and Akotia, 2017). The Integrated Master Schedule is a critical boundary object for megaprojects with long construction periods and a high degree of complexity and uncertainty (Chang et al, 2013).…”
Section: Bibliometricsmentioning
confidence: 99%