2011
DOI: 10.1002/geot.201100017
|View full text |Cite
|
Sign up to set email alerts
|

The conclusions of risk analysis as a basis for deciding between variants through the example of Contract H8 / Ein Fazit zur Risikoanalyse als Grundlage für eine Variantenentscheidung am Beispiel Los H8

Abstract: The Brenner Eisenbahn GmbH (BEG) was appointed in 1995 to design and construct the new railway line in the Lower Inn Valley between the national border near Kufstein and Innsbruck. In the densely populated Inn Valley, large parts of the line with a planned speed of 250 km/h had to be run through tunnels. Near Jenbach, a semi‐quantitative process was used as part of a risk analysis for the decision between the variants of a shallow, mined special construction and a deep mechanically driven tunnel. Die Brenner E… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
7
0
4

Year Published

2011
2011
2016
2016

Publication Types

Select...
2
1

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(11 citation statements)
references
References 0 publications
0
7
0
4
Order By: Relevance
“…On neighbouring contracts, such a method was used and conclusions derived from that experience can confirm the results of the risk analysis carried out for contract H4 [10].…”
Section: Investigation Of Variants For Contract Hin the Lower Inn Valleymentioning
confidence: 64%
See 4 more Smart Citations
“…On neighbouring contracts, such a method was used and conclusions derived from that experience can confirm the results of the risk analysis carried out for contract H4 [10].…”
Section: Investigation Of Variants For Contract Hin the Lower Inn Valleymentioning
confidence: 64%
“…Originally, the aim had been to offer two variants for market competition and allow the market price to decide which variant to construct. Due to the complexity of the process and the fact that different vertical alignments were required for the selection of process, and as only one variant had been handed in for railway approval, there would have been difficulties tendering one variant, which had not been approved, and one variant, which had been approved [10]. Die terminlichen Randbedingungen der Asfinag gaben eine Bauzeit für die Vortriebs-und Innenschalenarbeiten vor, die unabhängig davon, welche Variante für die Erkundungs-und gebirgsverbessernden Maßnahmen gewählt wird, bei konservativer Einschätzung schon aufgrund der langen Bestellzeit der TVM in keinem Fall erfüllt werden konnten.…”
Section: Investigation Of Variants For Contract Hin the Lower Inn Valleymentioning
confidence: 99%
See 3 more Smart Citations