2009 Asia and South Pacific Design Automation Conference 2009
DOI: 10.1109/aspdac.2009.4796527
|View full text |Cite
|
Sign up to set email alerts
|

Timing analysis and optimization implications of bimodal CD distribution in double patterning lithography

Abstract: Abstract-This paper revisits and extends a general linear programming (LP) formulation to exploit multiple knobs such as multi-L gate footprint-compatiblelibrariesandpost-layoutL gatebiasing to minimize total leakage power under timing constraints. We minimize positive timing slack for each cell according to its leakage vs. delay sensitivity, so that unnecessary leakage power consumption is saved without degrading circuit performance. A key difference between our work and previous works is that we pre-process … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
14
0

Year Published

2009
2009
2012
2012

Publication Types

Select...
5

Relationship

2
3

Authors

Journals

citations
Cited by 13 publications
(14 citation statements)
references
References 32 publications
0
14
0
Order By: Relevance
“…The work of [13] points out new 'bimodal' performance analysis and design optimization challenges arising from the two CD populations in double patterning. The existence of the two independent CD populations within a die takes away the presumptions of spatial correlation that have always been used to reduce pessimism in timing closure; this causes unpredictable clock skew and timing slack problems.…”
Section: Variations Are Caused By Overlay Error In (A) and By Spacmentioning
confidence: 99%
See 4 more Smart Citations
“…The work of [13] points out new 'bimodal' performance analysis and design optimization challenges arising from the two CD populations in double patterning. The existence of the two independent CD populations within a die takes away the presumptions of spatial correlation that have always been used to reduce pessimism in timing closure; this causes unpredictable clock skew and timing slack problems.…”
Section: Variations Are Caused By Overlay Error In (A) and By Spacmentioning
confidence: 99%
“…This can be solved by recoloring of conflicting cells or shifting cells with the help of whitespaces [13] so as to not cause coloring conflicts. A problem is that placement perturbation at the post-route stage or at near the signoff stage can always introduce new timing violations due to the changes in parasitic RC from ECO routing, unless the placement and routing changes are very localized.…”
Section: Variations Are Caused By Overlay Error In (A) and By Spacmentioning
confidence: 99%
See 3 more Smart Citations