2021
DOI: 10.1016/j.csite.2021.101010
|View full text |Cite
|
Sign up to set email alerts
|

Visual degradation and performance evaluation of utility scale solar photovoltaic power plant in hot and dry climate in western India

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0
1

Year Published

2021
2021
2023
2023

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 33 publications
(19 citation statements)
references
References 33 publications
0
9
0
1
Order By: Relevance
“…the module fault diagnosis using thermographic imaging on utility solar PV power plants and elucidated its accuracy in conjunction with saving effort and time has been reported by (Bakır , 2022) . PV plant visual degradation and performance analysis on a utility-scale power plant using visual inspection and commercial software and Supervisory Control and Data Acquisition collection by calculating various performance indices of the plant by (Bansal et al,2021) . the plant's performance and efficiency based on power losses and performance ratio and has used software like PVSYST and PV GIS to analyze the performance (Shiva Kumar and Sudhakar ,2015).…”
Section: Introductionmentioning
confidence: 99%
“…the module fault diagnosis using thermographic imaging on utility solar PV power plants and elucidated its accuracy in conjunction with saving effort and time has been reported by (Bakır , 2022) . PV plant visual degradation and performance analysis on a utility-scale power plant using visual inspection and commercial software and Supervisory Control and Data Acquisition collection by calculating various performance indices of the plant by (Bansal et al,2021) . the plant's performance and efficiency based on power losses and performance ratio and has used software like PVSYST and PV GIS to analyze the performance (Shiva Kumar and Sudhakar ,2015).…”
Section: Introductionmentioning
confidence: 99%
“…2.21%/year for micro-amorph (μa-Si), 0.05%/year for copper indium selenide (CIS), 2.6%/year for m-Si, 1.45%/year and 3.41%/year for p-Si. Furthermore, many investigations (see Table 1) have been carried out to understand PV degradation and failure in various locations with different climatic conditions throughout the world [47][48][49][50][51][52][53][54][55][56][57][58][59][60].…”
Section: Infrared (Ir) Thermography Is the Most Commonly Used Techniquementioning
confidence: 99%
“…Pada DKI Jakarta sendiri per tahun 2021 telah terinstal PLTS sebesar 11,08MW atau 73% dari target PLTS terinsatal dalam RUEN sebesar 13,8 MW pada tahun 2025 salah satunya ialah PLTS Carport yang terinstal di area perkantoran Kementerian ESDM. [6] Tantangan baru muncul dalam meningkatnya pemanfaatan PLTS yaitu menjaga unjuk kerja sistem PLTS tersebut, hal ini dikarenakan sama seperti sistem pada umumnya PLTS juga memiliki lifetime dalam beroperasi dan pasti mengalami degradasi setiap tahunnya [7], Oleh karena itu perawatan sistem PLTS merupakan sebuah hal yang penting untuk diperhatikan [8]. Pada Penelitian ini dilakukan Analisis terhadap unjuk kerja PLTS Carport 37,8kWp yang berada di area perkantoran Kementerian Energi Dan Sumber Daya Mineral Republik Indonesia di Jakarta Pusat.…”
Section: Pendahuluanunclassified